Visit
Official Website

Delta Sama Jaya Sdn Bhd
23G & 23M, DSSB Building,
Jalan Perdana 6/8,
Pandan Perdana,
55300 Kuala Lumpur,
Malaysia.

+603 9286 6328
+603 9281 3778
+603 9282 4007
+603-9287 0705

3M Armorcast Structural Material

Previous 2 / 8 Next


View / Print Catalogue




 

3M ARMORCAST STRUCTURAL MATERIAL



 

Product Description 


To give additional mechanical and UV protection for aerial cables, 3M provides the option to combine the completed tape joint with 3M Armorcast Rejacketing Kit No. AR-2. Installation of AR-2 is quick and easy. No need for flame, electricity or chemical. Perfect for all hazardous environments, including manholes. 

3M Armorcast Structural Tape is flexible fiberglass knot fabric strip saturated with resin syrup. No heat is required in the installation process, just water. It forms a tough durable covering that cures in 20 minutes. Provides structural strength, as well as cable and splice protection. For use on any cable jackets and sheath repair. The tacky, stretchy fiberglass reinforced  material adheres both to itself and polyethylene or lead sheaths. 



Special Features: 


 

  • Simple application. Ouick and easy to apply without a mess. 
  • Water activated resin. Gives control of set time. 
  • Durable. Strong, long life, water resistant and hard wearing. 
  • Light weight. The fiberglass construction of the tape allows for excellent mechanical protection without extra weight stress on the cables. 
  • Tack free. Gives ease of roll unwind during application. 
  • Resistant to moisture, fungus, acid, alkali, ozone, sunlight, gasoline and high temperatures
  • Comforms to irregular shapes and maintains the rigidity and shape. 

 


Application Instructions: 
 

  1. Wear a glove to protect hands from the resin. 
  2. Remove the roll from the foil pouch and dip in cool water, squeezing once. This will allow 4 to 5 minutes of cure time. Option: You can also apply directly eithout first dipping in water. The curing time will be longer if its not dipped in water. 
  3. Apply in spiral motion. Overlapping by half to two thirds on each turn. 
  4. Mold to aid lamination and cast strength. Use some water to help smoothen the surface. 
  5. Let it cure and dry. Cables can be moved in 30 minutes time. 









Product Image





Please leave your enquiry here, we will reply as soon as possible.
Name*  
Company Name  
Product Interested  
Quantity  
Email*  
Contact No.*  
Messages*  
   

available in
Recent Updates